IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0445 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,590 $1,500 Implemented
LE0445 # 03 Y:2017 03 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,163 $3,000 Not Implemented
LE0445 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $750 Implemented
LE0445 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $6,692 Implemented
LE0445 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,107 $1,000 Implemented
MI0313 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $3,884 Not Implemented
MI0313 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $164 $574 Implemented
MI0313 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $992 $1,660 Implemented
MI0313 # 06 Y:2017 06 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,082 $249 Implemented
MI0313 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,803 $1,580 Not Implemented
MI0313 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,626 $4,300 Not Implemented
MI0313 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,171 $1,160 Implemented
MI0313 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $6,519 $720 Implemented
MI0313 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,711 $620 Not Implemented
WV0541 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,969 $252,894 Not Implemented
WV0541 # 02 Y:2017 02 2017 INSTALL SENSORS TO DETECT DEFECTS $60,138 $100,000 Not Implemented
WV0541 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $40,630 $534 Implemented
WV0541 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,042 $29,880 Not Implemented
WV0541 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $29,320 $72,000 Not Implemented
WV0541 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $13,353 $1,514 Implemented
WV0541 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $3,860 $2,024 Implemented
WV0541 # 08 Y:2017 08 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $1,206 $5,500 Not Implemented
WV0541 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $869 $1,671 Implemented