IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0526 # 02 Y:2022 02 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,969 $0 Not Implemented
SU0526 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,491 $52 Not Implemented
SU0526 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $6,343 $792 Not Implemented
SU0526 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,823 $447 Not Implemented
SU0526 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $284 Not Implemented
SU0526 # 07 Y:2022 07 2022 INSTALL SET-BACK TIMERS $423 $627 Not Implemented
SU0526 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $158,273 $259,521 Not Implemented
SU0526 # 09 Y:2022 09 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,454 $16,991 Not Implemented
SU0526 # 10 Y:2022 10 2022 RECOVER WASTE HEAT FROM EQUIPMENT $98 $369 Not Implemented
SU0526 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $4,882 $0 Not Implemented
UW2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $2,080 Implemented
UW2208 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,686 $122 Implemented
UW2208 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
UW2208 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $643 $0 Implemented
UW2206 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $782 $0 Implemented
UW2206 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $2,080 Implemented
UW2206 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $2,199 Implemented
UW2206 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $567 $122 Implemented
UW2206 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,718 $0 Implemented
WV0619 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $46,415 $81,000 Not Implemented
WV0619 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $41,175 $63,410 Not Implemented
WV0619 # 03 Y:2022 03 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,971 $11,460 Not Implemented
WV0619 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,562 $534 Implemented
WV0619 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,481 $1,000 Implemented
WV0619 # 06 Y:2022 06 2022 DEVELOP A REPAIR/REPLACE POLICY $14,226 $1,514 Implemented