IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

373

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0148 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $1,124 $913 Implemented
IC0148 # 07 Y:2008 07 2008 BURN WASTE OIL FOR HEAT $4,155 $0 Implemented
MI0164 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $114,642 $3,960 Implemented
MI0164 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $80,047 $6,886 Implemented
MI0164 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,799 $40 Implemented
MI0164 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,597 $4,400 Implemented
MI0164 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0164 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,297 $40 Implemented
MI0164 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,992 $1,032 Implemented
DL0010 # 01 Y:2007 01 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,964 $2,872 Implemented
DL0010 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,305 $225 Implemented
DL0010 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,529 $450 Implemented
DL0010 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
UM0333 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $8,623 $100 Implemented
UM0333 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,901 $2,000 Implemented
UM0333 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,455 $100 Implemented
UM0333 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,589 $3,480 Implemented
MA0621 # 03 Y:2007 03 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,253 $10,000 Implemented
MA0621 # 05 Y:2007 05 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $405 $280 Implemented
OK0748 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,664 $3,013 Implemented
OK0748 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $559 Implemented
OK0748 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $6,840 Implemented
OK0748 # 04 Y:2007 04 2007 OPERATE BOILERS ON HIGH FIRE SETTING $22,448 $2,495 Implemented
OK0748 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $22,467 $1,029 Implemented
TT0004 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $20,486 $2,500 Implemented