Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 332813 | Electroplating, Plating, Polishing, Anodizing, and Coloring |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0588 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,132 | $4,668 | Implemented |
MA0588 # 02 Y:2005 | 02 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $2,294 | $500 | Implemented |
MA0588 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $3,404 | $2,197 | Implemented |
MA0586 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $443 | $1,395 | Implemented |
MA0586 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $841 | $1,646 | Implemented |
MA0586 # 05 Y:2005 | 05 | 2005 | COMBINE UTILITY METERS | $1,736 | $1,950 | Implemented |
MA0586 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,200 | $0 | Implemented |
MA0586 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,081 | $140 | Implemented |
IC0106 # 09 Y:2005 | 09 | 2005 | OPTIMIZE PLANT POWER FACTOR | $69,451 | $120,000 | Implemented |
IC0106 # 14 Y:2005 | 14 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,959 | $73,466 | Implemented |
IC0106 # 13 Y:2005 | 13 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,662 | $900 | Implemented |
IC0106 # 12 Y:2005 | 12 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,545 | $890 | Implemented |
IC0106 # 11 Y:2005 | 11 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $16,926 | $20,423 | Implemented |
IC0106 # 08 Y:2005 | 08 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,651 | $1,902 | Implemented |
IC0106 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,315 | $0 | Implemented |
IC0106 # 06 Y:2005 | 06 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $513 | $107 | Implemented |
IC0106 # 04 Y:2005 | 04 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,280 | $46,950 | Implemented |
IC0106 # 03 Y:2005 | 03 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $10,215 | $314 | Implemented |
IC0106 # 02 Y:2005 | 02 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $32,401 | $6,800 | Implemented |
IC0106 # 01 Y:2005 | 01 | 2005 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $19,946 | $16,320 | Implemented |
WV0315 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,726 | $1,000 | Implemented |
WV0315 # 04 Y:2005 | 04 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,658 | $0 | Implemented |
WV0315 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,438 | $640 | Implemented |
WV0315 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,495 | $2,560 | Implemented |
WV0315 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $467 | $20 | Implemented |