Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsNAICS | 332813 | Electroplating, Plating, Polishing, Anodizing, and Coloring |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0557 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $5,528 | $3,118 | Implemented |
MA0557 # 01 Y:2004 | 01 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,922 | $25,100 | Not Implemented |
MA0557 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,428 | $3,450 | Implemented |
MA0557 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $1,706 | $708 | Implemented |
IC0083 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,166 | $18,190 | Not Implemented |
IC0083 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $239 | $508 | Not Implemented |
IC0083 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,453 | $2,048 | Implemented |
IC0083 # 01 Y:2004 | 01 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $31,787 | $32,056 | Not Implemented |
UD0694 # 09 Y:2004 | 09 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,140 | $0 | Not Implemented |
UD0694 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $393 | $13 | Implemented |
UD0694 # 13 Y:2004 | 13 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $790 | $660 | Implemented |
UD0694 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $318,395 | $324,700 | Not Implemented |
UD0694 # 15 Y:2004 | 15 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $288 | $0 | Implemented |
UD0694 # 11 Y:2004 | 11 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $883 | $1,962 | Implemented |
UD0694 # 12 Y:2004 | 12 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $860 | $845 | Not Implemented |
UD0694 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $1,427 | $210 | Implemented |
UD0694 # 06 Y:2004 | 06 | 2004 | REDUCE VENTILATION AIR | $18,999 | $0 | Implemented |
UD0694 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $295,125 | $0 | Implemented |
UD0694 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,530 | $5,780 | Implemented |
UD0694 # 08 Y:2004 | 08 | 2004 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $4,207 | $3,323 | Not Implemented |
UD0694 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,763 | $51,348 | Implemented |
UD0694 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $117,513 | $80,244 | Not Implemented |
UD0694 # 04 Y:2004 | 04 | 2004 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $57,990 | $114,000 | Not Implemented |
MA0551 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $958 | $1,020 | Implemented |
MA0551 # 02 Y:2004 | 02 | 2004 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $13,353 | $27,860 | Implemented |