IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0438 # 04 Y:2013 04 2013 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $98,045 $175,000 Not Implemented
UM0438 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,608 $7,500 Not Implemented
UM0438 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $945 $600 Not Implemented
UM0438 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,260 $350 Not Implemented
BD0437 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $87,468 $54,000 Not Implemented
BD0437 # 11 Y:2013 11 2013 USE POWER DURING OFF-PEAK PERIODS $268 $60 Not Implemented
BD0437 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $510 $1,875 Not Implemented
BD0437 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,532 $20 Not Implemented
BD0437 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,609 $1,000 Not Implemented
BD0437 # 01 Y:2013 01 2013 INCREASE EFFICIENCY OF TRUCKS $168,734 $780,000 Not Implemented
BD0437 # 03 Y:2013 03 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $33,735 $100,000 Not Implemented
BD0437 # 04 Y:2013 04 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $19,574 $15,000 Not Implemented
BD0437 # 05 Y:2013 05 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,315 $20,000 Not Implemented
BD0437 # 08 Y:2013 08 2013 INSTALL TURBULATORS $5,570 $2,600 Not Implemented
BD0437 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,643 $10,000 Not Implemented
CO0675 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $270 $290 Implemented
CO0675 # 01 Y:2013 01 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $30,250 $172,320 Not Implemented
CO0675 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,730 $18,100 Not Implemented
CO0675 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $810 $1,280 Not Implemented
IP0017 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,754 $409 Implemented
IP0017 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $0 Not Implemented
IP0017 # 02 Y:2013 02 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,701 $0 Implemented
IP0017 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $805 $0 Implemented
IP0017 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $9,348 Implemented
IP0017 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,167 $1,400 Implemented