Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 332813 | Electroplating, Plating, Polishing, Anodizing, and Coloring |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0006 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,588 | $1,342 | Not Implemented |
CI0006 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,279 | $500 | Not Implemented |
CI0006 # 05 Y:2022 | 05 | 2022 | REPLACE BOILER | $13,563 | $27,000 | Not Implemented |
CI0006 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,859 | $82,655 | Not Implemented |
CI0006 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,728 | $6,000 | Not Implemented |
CI0006 # 02 Y:2022 | 02 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $26,391 | $90,000 | Not Implemented |
CI0006 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $28,328 | $32,800 | Not Implemented |
CI0005 # 02 Y:2022 | 02 | 2022 | REPLACE BOILER | $15,803 | $9,000 | Not Implemented |
CI0005 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,200 | $16,400 | Not Implemented |
CI0005 # 10 Y:2022 | 10 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $323 | $0 | Not Implemented |
CI0005 # 09 Y:2022 | 09 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $563 | $500 | Implemented |
CI0005 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,446 | $0 | Not Implemented |
CI0005 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,483 | $99 | Implemented |
CI0005 # 06 Y:2022 | 06 | 2022 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $2,348 | $8,100 | Not Implemented |
CI0005 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,625 | $13,372 | Not Implemented |
CI0005 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,840 | $300 | Not Implemented |
CI0005 # 03 Y:2022 | 03 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,639 | $30,000 | Not Implemented |
TR0028 # 05 Y:2022 | 05 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $787 | $1,511 | Implemented |
TR0028 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,584 | $602 | Implemented |
TR0028 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,119 | $11,200 | Not Implemented |
TR0028 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,972 | $3,155 | Implemented |
TR0028 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,361 | $5,404 | Not Implemented |
SU0516 # 09 Y:2022 | 09 | 2022 | REDUCE VENTILATION AIR | $1,107 | $2,030 | Implemented |
SU0516 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,406 | $1,750 | Not Implemented |
SU0516 # 07 Y:2022 | 07 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $857 | $696 | Implemented |