Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,420
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2511 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,999 | $8,485 | n/a |
UC2511 # 09 Y:2025 | 09 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $116,730 | $360,000 | n/a |
UC2511 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $6,789 | $14,000 | n/a |
UC2511 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,520 | $10,625 | n/a |
UC2511 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,109 | $1,474 | n/a |
UC2511 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $3,267 | $2,180 | n/a |
UC2511 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,290 | $2,200 | n/a |
UC2511 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $225,469 | $2,423,010 | n/a |
UC2511 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,726 | $75 | n/a |
MU0070 # 14 Y:2025 | 14 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $178 | $0 | n/a |
MU0070 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $121 | $177 | n/a |
MU0070 # 01 Y:2025 | 01 | 2025 | USE UTILITY CONTROLLED POWER MANAGEMENT | $5,350 | $0 | n/a |
MU0070 # 08 Y:2025 | 08 | 2025 | USE PHOTOCELL CONTROLS | $150 | $296 | n/a |
MU0070 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $75 | n/a |
MU0070 # 10 Y:2025 | 10 | 2025 | REDUCE HEAT GAIN BY WINDOW TINTING | $550 | $6,426 | n/a |
MU0070 # 11 Y:2025 | 11 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6 | $65 | n/a |
MU0070 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,332 | $6,432 | n/a |
MU0070 # 12 Y:2025 | 12 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $185 | $352 | n/a |
MU0070 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $173 | $1,250 | n/a |
MU0070 # 13 Y:2025 | 13 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $61 | $152 | n/a |
MU0070 # 07 Y:2025 | 07 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $660 | $0 | n/a |
MU0070 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $881 | $0 | n/a |
MU0070 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $545 | $348 | n/a |
UF0635 # 01 Y:2025 | 01 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $45,327 | $12,413 | n/a |
UF0635 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,006 | $322,608 | n/a |