IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0689 # 04 Y:2012 04 2012 USE OPTIMUM TEMPERATURE $13,757 $8,000 Implemented
MA0689 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,785 $3,000 Implemented
MA0689 # 09 Y:2012 09 2012 USE OPTIMUM TEMPERATURE $5,818 $900 Implemented
MA0689 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,677 $9,750 Implemented
MA0689 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,958 $9,500 Not Implemented
MA0689 # 10 Y:2012 10 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,139 $5,200 Implemented
MA0689 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,144 $1,000 Implemented
MA0689 # 12 Y:2012 12 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,245 $1,500 Implemented
MA0689 # 13 Y:2012 13 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,032 $700 Implemented
MA0689 # 14 Y:2012 14 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,657 $6,000 Not Implemented
MA0689 # 15 Y:2012 15 2012 INSULATE BARE EQUIPMENT $1,579 $2,300 Implemented
MA0689 # 16 Y:2012 16 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,244 $1,000 Implemented
MA0689 # 17 Y:2012 17 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,042 $500 Implemented
MA0689 # 18 Y:2012 18 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $717 $200 Implemented
MA0634 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,407 $20,000 Not Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
MA0634 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,058 $3,000 Not Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 05 Y:2008 05 2008 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,034 $6,000 Not Implemented
MA0597 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $2,161 $668 Implemented
MA0597 # 05 Y:2006 05 2006 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $3,292 $19,000 Not Implemented
MA0597 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $4,902 $1,000 Implemented
MA0597 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,643 $17,818 Implemented
MA0597 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,984 $17,660 Implemented