Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,304
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0001 # 03 Y:2017 | 03 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $112 | $0 | Implemented |
TR0001 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $441 | $237 | Implemented |
TR0001 # 05 Y:2017 | 05 | 2017 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,143 | $50 | Not Implemented |
TR0001 # 06 Y:2017 | 06 | 2017 | INSTALL REPLACEMENT DOORS | $9,766 | $5,000 | Implemented |
TR0001 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,442 | $2,500 | Implemented |
TR0001 # 08 Y:2017 | 08 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,422 | $6 | Implemented |
AS0436 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,161 | $100 | Not Implemented |
AS0436 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $8,511 | $4,200 | Not Implemented |
AS0436 # 03 Y:2017 | 03 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $887 | $1,113 | Not Implemented |
AS0436 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $106,561 | $115,692 | Not Implemented |
AS0436 # 05 Y:2017 | 05 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,490 | $12,200 | Not Implemented |
MA0773 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,653 | $30,000 | Not Implemented |
MA0773 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,580 | $14,050 | Implemented |
MA0773 # 03 Y:2017 | 03 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,593 | $10,625 | Implemented |
MA0773 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,564 | $6,660 | Not Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
MA0773 # 06 Y:2017 | 06 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $501 | $100 | Not Implemented |
SU0434 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,568 | $0 | Not Implemented |
SU0434 # 02 Y:2017 | 02 | 2017 | ELIMINATE/REDUCE AN OPERATION | $22,994 | $2,160 | Not Implemented |
SU0434 # 03 Y:2017 | 03 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,568 | $2,420 | Implemented |
SU0434 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $469 | $507 | Implemented |
SU0434 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $3,148 | Not Implemented |
UM0478 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,075 | $2,000 | n/a |
UM0478 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,034 | $5,000 | n/a |
UM0478 # 03 Y:2017 | 03 | 2017 | USE PHOTOCELL CONTROLS | $3,028 | $0 | n/a |