IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,304

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0402 # 12 Y:2007 12 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,070 $3,770 Implemented
MS0304 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289,291 $222,009 Implemented
MS0304 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118,243 $1,820 Implemented
MS0304 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,366 $16,063 Implemented
MS0304 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $7,010 $153 Implemented
WI0525 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,775 $23,040 Not Implemented
WI0525 # 02 Y:2006 02 2006 MODIFY WORKLOAD $11,666 $9,000 Not Implemented
WI0525 # 03 Y:2006 03 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,600 $0 Not Implemented
WI0525 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $3,880 $0 Not Implemented
WI0525 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $185 $400 Not Implemented
IA0394 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,729 $4,200 Implemented
IA0394 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,709 $6,500 Implemented
IA0394 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,998 $25 Implemented
IA0394 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,184 $74 Not Implemented
IA0394 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,292 $44,400 Not Implemented
IA0394 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,584 $15,900 Not Implemented
IA0394 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $25,628 $15,200 Not Implemented
IA0394 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $2,083 $1,969 Not Implemented
UF0386 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,441 $4,440 Not Implemented
UF0386 # 02 Y:2006 02 2006 ADD AREA LIGHTING SWITCHES $5,721 $13,094 Not Implemented
UF0386 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,878 $0 Not Implemented
UF0386 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,880 $56 Not Implemented
UF0386 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,101 $1,703 Not Implemented
UF0386 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,727 $1,457 Not Implemented
UF0386 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $811 $0 Not Implemented