IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0625 # 10 Y:2024 10 2024 IMPROVE SPACE COMFORT CONDITIONING $9,256 $2,512 n/a
UF0625 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $710 $0 n/a
UF0625 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,573 $3,962 n/a
UF0625 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,440 $6,188 n/a
UF0625 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,082 $469 n/a
UF0625 # 09 Y:2024 09 2024 IMPROVE SPACE COMFORT CONDITIONING $31,920 $804 n/a
UF0625 # 08 Y:2024 08 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $68,287 $300,000 n/a
UF0625 # 03 Y:2024 03 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,895 $5,801 n/a
UF0625 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $33,462 $12,390 n/a
UF0625 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $51,273 $322,608 n/a
MI0401 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,273 $1,930 Implemented
MI0401 # 03 Y:2022 03 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,485 $25,433 Implemented
MI0401 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $8,603 $24,100 Not Implemented
MI0401 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,026 $580 Implemented
MI0401 # 05 Y:2022 05 2022 METER WASTE WATER $3,900 $900 Not Implemented
MI0401 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,022 $2,050 Not Implemented
MI0401 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $2,280 $2,998 Not Implemented
MI0399 # 02 Y:2021 02 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,060 $240,000 Implemented
MI0399 # 01 Y:2021 01 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $115,960 $157,500 Not Implemented
MI0399 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,245 $70,400 Implemented
MI0399 # 06 Y:2021 06 2021 METER WASTE WATER $4,166 $900 Not Implemented
MI0399 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,670 Implemented
MI0399 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,020 $320 Implemented
MI0399 # 07 Y:2021 07 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,286 $4,468 Implemented
MI0387 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,824 $120 Implemented