IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0721 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $530 $360 Not Implemented
AM0721 # 07 Y:2016 07 2016 USE SYNTHETIC LUBRICANT $420 $0 Not Implemented
AM0721 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $2,410 Implemented
AM0721 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $670 Implemented
AM0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,440 $2,000 Implemented
AM0721 # 03 Y:2016 03 2016 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,710 $360 Not Implemented
AM0721 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,960 $0 Implemented
BD0491 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $601 $1,800 Not Implemented
BD0491 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,456 $2,700 Implemented
BD0491 # 03 Y:2016 03 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,307 $7,500 Implemented
BD0491 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,994 $20 Implemented
BD0491 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,310 $30,685 Not Implemented
BD0491 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,795 $6,550 Implemented
BD0491 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,131 $2,800 Implemented
BD0491 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $190 Implemented
BD0491 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,064 $500 Not Implemented
BD0491 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $778 $600 Implemented
BD0491 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $1,000 Implemented
IP0067 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,374 $3,150 Implemented
IP0067 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $12,719 $2,549 Not Implemented
IP0067 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,858 $765 Implemented
IP0067 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,092 $5 Not Implemented
IP0067 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $9,360 $3 Implemented
IP0067 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,896 $791 Not Implemented
IP0067 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $996 $0 Implemented