IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
NAICS 332912 Fluid Power Valve and Hose Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0276 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $37,334 $25,000 Not Implemented
TT0276 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,344 $24,750 Implemented
TT0276 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $22,303 $60 Implemented
TT0276 # 04 Y:2022 04 2022 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $35,279 $40,000 Not Implemented
TT0276 # 09 Y:2022 09 2022 CHANGE OPERATING CONDITIONS $6,750 $2,000 Implemented
TT0276 # 01 Y:2022 01 2022 ADOPT IN-HOUSE MATERIAL GENERATION $42,153 $40,000 Not Implemented
TT0276 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $125,911 $145,300 Not Implemented
TT0276 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,766 $40 Not Implemented
TT0276 # 12 Y:2022 12 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,455 $6,840 Not Implemented
TT0276 # 11 Y:2022 11 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,311 $2,240 Not Implemented
TT0276 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $16,112 $15,000 Not Implemented
TT0276 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,657 $3,175 Implemented
UA0251 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,595 $100 Not Implemented
UA0251 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $7,062 $1,190 Not Implemented
UA0251 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,263 $2,002 Not Implemented
UA0251 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,641 $128 Not Implemented
UA0251 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $24,626 $4,208 Not Implemented
WM0144 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,011 $0 Not Implemented
WM0144 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,839 $37,265 Not Implemented
WM0144 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,785 $2,000 Not Implemented
WM0144 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,365 $3,000 Not Implemented
WM0144 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,876 $6,000 Not Implemented
WM0144 # 02 Y:2019 02 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,063 $148,245 Not Implemented
WM0144 # 06 Y:2019 06 2019 USE SYNTHETIC LUBRICANT $2,446 $5,600 Not Implemented
WM0144 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,411 $2,720 Not Implemented