IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,548

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1081 # 10 Y:2024 10 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $621 $249 n/a
UD1081 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $55,362 $6,264 n/a
UD1081 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,626 $7,875 n/a
UD1080 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,018 $924 Implemented
UD1080 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $808 $941 Implemented
UD1080 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31 $142 Not Implemented
UD1080 # 03 Y:2024 03 2024 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $1,555 $405 Not Implemented
UD1080 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $165 $0 Not Implemented
UD1080 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,541 $11,151 Implemented
MS0424 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $74,358 $275,000 n/a
MS0424 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $50,990 $507,500 n/a
MS0424 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,613 $19,215 n/a
IC0295 # 06 Y:2024 06 2024 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,247 $16,893 Not Implemented
IC0295 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $7,539 Not Implemented
IC0295 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,248 $0 Implemented
IC0295 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,690 $3,413 Implemented
IC0295 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $843 $490 Implemented
IC0295 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,497 $558 Implemented
IC0295 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,221 $6,343 Not Implemented
CI0021 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $2,177 $2,500 n/a
CI0021 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,619 $300 n/a
CI0021 # 05 Y:2023 05 2023 USE PHOTOCELL CONTROLS $3,983 $2,500 n/a
CI0021 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,548 $0 n/a
CI0021 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,563 $3,850 n/a
CI0021 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,010 $43,210 n/a