IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0057 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $3,328 $604 Not Implemented
IP0057 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $5,533 $807 Not Implemented
IP0057 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $115 Implemented
IP0057 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $401 $20 Not Implemented
IP0057 # 04 Y:2016 04 2016 COVER OPEN TANKS $3,767 $0 Implemented
IP0057 # 03 Y:2016 03 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $311 $0 Not Implemented
IP0057 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $560 $0 Implemented
IP0057 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,552 $0 Not Implemented
IP0057 # 15 Y:2016 15 2016 RECOVER WASTE HEAT FROM EQUIPMENT $464 $1,038 Not Implemented
IP0057 # 16 Y:2016 16 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $190 $664 Implemented
IP0057 # 17 Y:2016 17 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $8,619 $30,789 Not Implemented
IP0057 # 18 Y:2016 18 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $534 $2,607 Implemented
IP0015 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,010 $1,400 Implemented
IP0015 # 08 Y:2013 08 2013 OPTIMIZE PLANT POWER FACTOR $10,702 $17,052 Not Implemented
IP0015 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,795 $8,625 Implemented
IP0015 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $7,093 $380 Implemented
IP0015 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,044 $118 Not Implemented
IP0015 # 03 Y:2013 03 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $730 $0 Not Implemented
IP0015 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,757 $0 Not Implemented
IP0015 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,644 $0 Implemented
IP0015 # 09 Y:2013 09 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,144 $3,702 Not Implemented
IC0145 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $466 $3,785 Not Implemented
IC0145 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,047 $112,631 Not Implemented
IC0145 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $4,664 Not Implemented
IC0145 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,604 $14,300 Not Implemented