Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsNAICS | 33299 | All Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0390 # 07 Y:2009 | 07 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,020 | $2,500 | Implemented |
WV0390 # 08 Y:2009 | 08 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,650 | $0 | Implemented |
WV0390 # 09 Y:2009 | 09 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,395 | $0 | Implemented |
WV0390 # 10 Y:2009 | 10 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,698 | $3,136 | Not Implemented |
WV0390 # 11 Y:2009 | 11 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,238 | $4,744 | Implemented |
WV0390 # 12 Y:2009 | 12 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,219 | $582 | Not Implemented |
WV0390 # 13 Y:2009 | 13 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $246 | $326 | Implemented |
UD0714 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $14,094 | $5,000 | Not Implemented |
UD0714 # 02 Y:2005 | 02 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $13,500 | $10,000 | Not Implemented |
UD0714 # 03 Y:2005 | 03 | 2005 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $12,150 | $1,000 | Implemented |
UD0714 # 04 Y:2005 | 04 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $6,825 | $3,000 | Implemented |
UD0714 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,482 | $2,000 | Not Implemented |
UD0714 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,427 | $14,204 | Not Implemented |
UD0714 # 07 Y:2005 | 07 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,772 | $165 | Implemented |
UD0714 # 08 Y:2005 | 08 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $1,972 | $150 | Implemented |
UD0714 # 09 Y:2005 | 09 | 2005 | MINIMIZE WATER USAGE | $1,311 | $1,200 | Implemented |
UD0714 # 10 Y:2005 | 10 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,296 | $0 | Implemented |
UD0714 # 11 Y:2005 | 11 | 2005 | MINIMIZE WATER USAGE | $1,138 | $350 | Implemented |
UD0714 # 12 Y:2005 | 12 | 2005 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,000 | $4,000 | Not Implemented |
UD0714 # 13 Y:2005 | 13 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $928 | $200 | Not Implemented |
UD0714 # 14 Y:2005 | 14 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $884 | $330 | Not Implemented |
UD0714 # 15 Y:2005 | 15 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $884 | $0 | Implemented |
UD0714 # 16 Y:2005 | 16 | 2005 | INSULATE BARE EQUIPMENT | $361 | $650 | Not Implemented |
WV0286 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,216 | $7,012 | Not Implemented |
WV0286 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $4,469 | $3,580 | Implemented |