Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 33299 | All Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0380 # 06 Y:2014 | 06 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $22,320 | $54,000 | Not Implemented |
LE0380 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $593 | $520 | Not Implemented |
LE0380 # 01 Y:2014 | 01 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,389 | $780 | Not Implemented |
LE0380 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,916 | $5,000 | Not Implemented |
LE0380 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $938 | $1,936 | Not Implemented |
LE0380 # 04 Y:2014 | 04 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,824 | $2,960 | Not Implemented |
LE0380 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,774 | $800 | Not Implemented |
LE0380 # 09 Y:2014 | 09 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $607 | $2,000 | Not Implemented |
LE0380 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,740 | $4,950 | Not Implemented |
OK0890 # 07 Y:2014 | 07 | 2014 | USE MINIMUM SAFE OVEN VENTILATION | $30,394 | $1,000 | Implemented |
OK0890 # 04 Y:2014 | 04 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,200 | $0 | Implemented |
OK0890 # 03 Y:2014 | 03 | 2014 | INSTALL COMMON HEADER ON COMPRESSORS | $1,460 | $1,200 | Not Implemented |
OK0890 # 02 Y:2014 | 02 | 2014 | INSTALL COMMON HEADER ON COMPRESSORS | $8,687 | $4,800 | Implemented |
OK0890 # 01 Y:2014 | 01 | 2014 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,580 | $770 | Not Implemented |
OK0890 # 06 Y:2014 | 06 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,700 | $0 | Implemented |
OK0890 # 05 Y:2014 | 05 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $6,400 | $1,230 | Implemented |
BS0034 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,549 | $4,061 | Implemented |
BS0034 # 06 Y:2014 | 06 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,513 | $2,503 | Implemented |
BS0034 # 07 Y:2014 | 07 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $946 | $2,100 | Not Implemented |
BS0034 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,850 | $255 | Implemented |
BS0034 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $10,406 | $20,000 | Not Implemented |
BS0034 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $74,212 | $31,860 | Not Implemented |
BS0034 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,966 | $45,410 | Not Implemented |
BS0034 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,073 | $49,835 | Not Implemented |
BS0034 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,083 | $304 | Implemented |