IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0693 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,525 $15,240 Not Implemented
AM0693 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $247 $863 Implemented
AM0693 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $683 $13 Not Implemented
AM0693 # 04 Y:2015 04 2015 DISCONNECT BALLASTS $809 $188 Implemented
AM0694 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $580 Implemented
AM0694 # 01 Y:2015 01 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,400 $9,800 Not Implemented
AM0693 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14 $0 Not Implemented
AM0693 # 08 Y:2015 08 2015 USE SYNTHETIC LUBRICANT $40 $0 Not Implemented
AM0693 # 07 Y:2015 07 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $165 $142 Implemented
AM0694 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $100 $140 Not Implemented
AM0694 # 03 Y:2015 03 2015 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $1,225 $0 Not Implemented
AM0694 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $30 Not Implemented
AM0693 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,605 $1,975 Implemented
AM0693 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
OK0927 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $19,646 $14,000 Not Implemented
OK0927 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,107 $133,275 Implemented
SD0520 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $43,686 $162,100 Implemented
SD0520 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,173 $100,875 Implemented
SD0520 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $25,778 $100,200 Implemented
SD0520 # 04 Y:2015 04 2015 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $13,855 $24,332 Implemented
SD0520 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,765 $9,630 Implemented
SD0520 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $1,826 $2,590 Implemented
SD0520 # 07 Y:2015 07 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $562 $214 Implemented
UK1507 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $1,822 $2,818 Not Implemented
UK1507 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,894 $18,750 Implemented