IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0794 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,640 $121,500 Implemented
MA0794 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,216 $852 Implemented
MA0794 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $710 $2,583 Not Implemented
MA0794 # 02 Y:2018 02 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,204 $51,700 Not Implemented
MA0794 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,123 $4,092 Not Implemented
WV0565 # 07 Y:2018 07 2018 USE EVAPORATION TO CONCENTRATE MATERIAL $733 $1,750 Not Implemented
WV0565 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,443 $80,480 Not Implemented
WV0565 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $77,310 $17,740 Implemented
WV0565 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $810 $1,600 Implemented
WV0565 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $40 Implemented
WV0565 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,434 $68,000 Not Implemented
WV0565 # 05 Y:2018 05 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,441 $500 Implemented
WV0565 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $2,854 $533 Implemented
LE0460 # 04 Y:2018 04 2018 REPLACE BOILER $6,378 $28,000 Not Implemented
LE0460 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,333 $19,000 Not Implemented
LE0460 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,239 $14,500 Not Implemented
LE0460 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $1,000 Not Implemented
LE0460 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $650 $40 Not Implemented
IP0101 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,806 $46,651 Implemented
IP0101 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $498 Implemented
OK0980 # 04 Y:2018 04 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,198 $23,580 Not Implemented
OK0980 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,343 $31,350 Not Implemented
OK0980 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $13,258 $16,892 Not Implemented
OK0980 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $7,298 Not Implemented
OK0980 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,443 $4,790 Not Implemented