Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsNAICS | 332994 | Small Arms, Ordnance, and Ordnance Accessories Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0930 # 07 Y:2015 | 07 | 2015 | INSTALL COMMON HEADER ON COMPRESSORS | $5,330 | $1,018 | Implemented |
UD0930 # 08 Y:2015 | 08 | 2015 | COVER OPEN TANKS | $5,393 | $300 | Implemented |
UD0930 # 05 Y:2015 | 05 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $43,664 | $10,000 | Not Implemented |
UD0930 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,067 | $17,500 | Not Implemented |
UD0930 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,352 | $0 | Implemented |
UD0930 # 03 Y:2015 | 03 | 2015 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $2,426 | $300 | Not Implemented |
UD0930 # 04 Y:2015 | 04 | 2015 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $34,411 | $5,100 | Implemented |
UD0930 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $59,188 | $0 | Implemented |
UA0036 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,392 | $0 | Implemented |
UA0036 # 02 Y:2009 | 02 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $3,429 | $1,700 | Implemented |
UA0036 # 03 Y:2009 | 03 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,005 | $15,600 | Not Implemented |
UA0036 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,387 | $40,768 | Implemented |
UA0036 # 05 Y:2009 | 05 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,452 | $10,320 | Not Implemented |
UA0036 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $912 | $1,500 | Implemented |
UA0036 # 08 Y:2009 | 08 | 2009 | USE PHOTOCELL CONTROLS | $453 | $1,337 | Not Implemented |
UA0036 # 07 Y:2009 | 07 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,637 | $17,500 | Not Implemented |
MA0634 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $498 | $500 | Implemented |
MA0634 # 05 Y:2008 | 05 | 2008 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,034 | $6,000 | Not Implemented |
MA0634 # 04 Y:2008 | 04 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,932 | $2,500 | Implemented |
MA0634 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,058 | $3,000 | Not Implemented |
MA0634 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,407 | $20,000 | Not Implemented |
MA0634 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,014 | $119,495 | Implemented |
UU0053 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,354 | $4,100 | Not Implemented |
UU0053 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,131 | $55 | Not Implemented |
UU0053 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,710 | $2,000 | Not Implemented |