IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 332994 Small Arms, Ordnance, and Ordnance Accessories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0036 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $3,429 $1,700 Implemented
UA0036 # 03 Y:2009 03 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,005 $15,600 Not Implemented
UA0036 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,387 $40,768 Implemented
UA0036 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $6,452 $10,320 Not Implemented
UA0036 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,500 Implemented
UA0036 # 07 Y:2009 07 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,637 $17,500 Not Implemented
UA0036 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $453 $1,337 Not Implemented
MA0634 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,407 $20,000 Not Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,058 $3,000 Not Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 05 Y:2008 05 2008 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,034 $6,000 Not Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
UU0053 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,354 $4,100 Not Implemented
UU0053 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,131 $55 Not Implemented
UU0053 # 06 Y:2003 06 2003 INSTALL TURBULATORS $2,610 $1,572 Not Implemented
UU0053 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,710 $2,000 Not Implemented
UU0053 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,112 $70,635 Not Implemented
UU0053 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,869 $2,340 Implemented
SU0158 # 10 Y:2003 10 2003 $4,599 $0 Implemented
SU0158 # 09 Y:2003 09 2003 $5,056 $0 Implemented
SU0158 # 08 Y:2003 08 2003 RECOVER AND REUSE SPENT ACID BATHS $7,052 $6,521 Not Implemented
SU0158 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,325 $5,200 Implemented
SU0158 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,164 $235,000 Not Implemented
SU0158 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152,410 $301,250 Not Implemented