Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
954
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2511 # 09 Y:2025 | 09 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $116,730 | $360,000 | n/a |
UC2511 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,726 | $75 | n/a |
UC2511 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,109 | $1,474 | n/a |
UC2511 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $225,469 | $2,423,010 | n/a |
UC2511 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $6,789 | $14,000 | n/a |
UC2511 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,520 | $10,625 | n/a |
UC2511 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $3,267 | $2,180 | n/a |
UC2511 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,999 | $8,485 | n/a |
UC2511 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,290 | $2,200 | n/a |
MU0070 # 08 Y:2025 | 08 | 2025 | USE PHOTOCELL CONTROLS | $150 | $296 | n/a |
MU0070 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $545 | $348 | n/a |
MU0070 # 14 Y:2025 | 14 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $178 | $0 | n/a |
MU0070 # 11 Y:2025 | 11 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6 | $65 | n/a |
MU0070 # 12 Y:2025 | 12 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $185 | $352 | n/a |
MU0070 # 13 Y:2025 | 13 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $61 | $152 | n/a |
MU0070 # 01 Y:2025 | 01 | 2025 | USE UTILITY CONTROLLED POWER MANAGEMENT | $5,350 | $0 | n/a |
MU0070 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $75 | n/a |
MU0070 # 07 Y:2025 | 07 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $660 | $0 | n/a |
MU0070 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $173 | $1,250 | n/a |
MU0070 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $121 | $177 | n/a |
MU0070 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $881 | $0 | n/a |
MU0070 # 10 Y:2025 | 10 | 2025 | REDUCE HEAT GAIN BY WINDOW TINTING | $550 | $6,426 | n/a |
MU0070 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,332 | $6,432 | n/a |
UF0635 # 01 Y:2025 | 01 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $45,327 | $12,413 | n/a |
UF0635 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,006 | $322,608 | n/a |