Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
897
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0378 # 03 Y:2008 | 03 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,322 | $20 | Not Implemented |
WV0378 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,478 | $513 | Not Implemented |
WV0378 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,117 | $8,400 | Not Implemented |
MS0329 # 01 Y:2008 | 01 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $172,142 | $1,000 | Not Implemented |
MS0329 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,660 | $8,899 | Not Implemented |
MS0329 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,458 | $256 | Not Implemented |
MS0329 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,327 | $7,955 | Not Implemented |
MS0329 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $844 | $1,500 | Not Implemented |
MS0329 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $500 | $912 | Not Implemented |
UA0019 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,934 | $3,000 | Implemented |
UA0019 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,527 | $0 | Implemented |
UA0019 # 03 Y:2008 | 03 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $426 | $2,016 | Implemented |
UA0019 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,534 | $106,743 | Not Implemented |
UA0019 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $4,299 | Not Implemented |
UA0019 # 06 Y:2008 | 06 | 2008 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $16,660 | $0 | Implemented |
UA0019 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $377 | $520 | Implemented |
UA0019 # 08 Y:2008 | 08 | 2008 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,641 | $11,901 | Not Implemented |
UA0019 # 09 Y:2008 | 09 | 2008 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,953 | $0 | Not Implemented |
UA0019 # 10 Y:2008 | 10 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $46,005 | $22,000 | Not Implemented |
UA0019 # 11 Y:2008 | 11 | 2008 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $48,714 | $9,100 | Not Implemented |
SD0404 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,578 | $0 | Implemented |
SD0404 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,544 | $29,161 | Implemented |
SD0404 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,356 | $8,130 | Not Implemented |
SD0404 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,382 | $4,270 | Not Implemented |
SD0404 # 05 Y:2008 | 05 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,071 | $2,035 | Implemented |