IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

897

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0200 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,899 $200 Not Implemented
DL0200 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,955 $0 Implemented
DL0200 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,029 $0 Not Implemented
IC0254 # 04 Y:2022 04 2022 INSTALL EFFICIENT RECTIFIERS $111,422 $1,500,000 Not Implemented
IC0254 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,568 $1,800 Not Implemented
IC0254 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,303 $4,300 Not Implemented
IC0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,289 $19,578 Not Implemented
IC0252 # 04 Y:2021 04 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,533 $230 Not Implemented
IC0252 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $16,762 $27,372 Not Implemented
IC0252 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,710 $5,524 Not Implemented
IC0252 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,022 $4,053 Not Implemented
WM0171 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,582 $3,000 Implemented
WM0171 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,771 $1,090 Not Implemented
WM0171 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,638 $0 Not Implemented
WM0171 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $844 Implemented
WM0171 # 06 Y:2021 06 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,495 $5,000 Not Implemented
WM0171 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $682 $2,268 Implemented
WM0171 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $1,500 Implemented
OK1059 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,353 $8,612 Implemented
OK1059 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $361 $1,395 Not Implemented
OK1059 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Implemented
OK1059 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $251 $160 Not Implemented
NL0054 # 09 Y:2021 09 2021 RECOVER AND REUSE WASTE MATERIAL $1,876 $6,000 Not Implemented
NL0054 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,217 $1,920 Not Implemented
NL0054 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,528 $7,371 Not Implemented