Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0794 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $710 | $2,583 | Not Implemented |
MA0794 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,216 | $852 | Implemented |
MA0794 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $2,123 | $4,092 | Not Implemented |
MA0794 # 02 Y:2018 | 02 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,204 | $51,700 | Not Implemented |
MA0794 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,640 | $121,500 | Implemented |
MA0773 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,580 | $14,050 | Implemented |
MA0773 # 06 Y:2017 | 06 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $501 | $100 | Not Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
MA0773 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,564 | $6,660 | Not Implemented |
MA0773 # 03 Y:2017 | 03 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,593 | $10,625 | Implemented |
MA0773 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,653 | $30,000 | Not Implemented |
MA0597 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $25,107 | $85,300 | Not Implemented |
MA0597 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $909 | $775 | Not Implemented |
MA0597 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,402 | $0 | Implemented |
MA0597 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $2,161 | $668 | Implemented |
MA0597 # 05 Y:2006 | 05 | 2006 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $3,292 | $19,000 | Not Implemented |
MA0597 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $4,902 | $1,000 | Implemented |
MA0597 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $5,643 | $17,818 | Implemented |
MA0597 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,984 | $17,660 | Implemented |