Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0264 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $183 | $249 | Not Implemented |
MS0264 # 05 Y:2004 | 05 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $989 | $944 | Not Implemented |
MS0264 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,356 | $1,624 | Not Implemented |
MS0264 # 03 Y:2004 | 03 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $2,457 | $480 | Not Implemented |
MS0264 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,737 | $318 | Implemented |
MS0264 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,471 | $84,783 | Implemented |
CO0555 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $220 | $420 | Not Implemented |
CO0555 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $120 | $390 | Not Implemented |
CO0555 # 01 Y:2004 | 01 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $4,790 | $13,100 | Implemented |
CO0555 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,890 | $37,430 | Not Implemented |
CO0555 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,540 | $4,990 | Not Implemented |
CO0555 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $186 | $260 | Implemented |
CO0555 # 02 Y:2004 | 02 | 2004 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $900 | $580 | Implemented |
BD0273 # 10 Y:2004 | 10 | 2004 | UTILIZE OUTSIDE CONTRACTING | $14,286 | $200 | Implemented |
BD0273 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,185 | $2,900 | Implemented |
BD0273 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,942 | $255 | Implemented |
BD0273 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,098 | $0 | Implemented |
BD0273 # 09 Y:2004 | 09 | 2004 | USE PLASTIC PALLETS INSTEAD OF WOOD | $22,476 | $27,625 | Implemented |
BD0273 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $2,608 | $1,725 | Implemented |
BD0273 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,606 | $4,270 | Implemented |
BD0273 # 03 Y:2004 | 03 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $6,786 | $3,000 | Implemented |
BD0273 # 02 Y:2004 | 02 | 2004 | INSTALL WIND POWERED ELECTRIC GENERATOR | $10,682 | $50,000 | Implemented |
BD0273 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,813 | $3,470 | Implemented |
BD0272 # 14 Y:2004 | 14 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $14,414 | $590 | Implemented |
BD0272 # 16 Y:2004 | 16 | 2004 | UTILIZE OUTSIDE CONTRACTING | $57,614 | $200 | Implemented |