IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1051 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,689 $325 Implemented
UD1051 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,083 $0 Implemented
UD1051 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $0 Implemented
UD1051 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,807 $0 Implemented
UD1051 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,461 $0 Implemented
UK1509 # 15 Y:2015 15 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,579 $4,086 Implemented
UK1509 # 14 Y:2015 14 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,160 $18,174 Implemented
UK1509 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,014 $1,858 Implemented
UK1509 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,895 $4,000 Implemented
UK1509 # 08 Y:2015 08 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,869 $10,000 Implemented
UK1509 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,118 $800 Implemented
UK1509 # 06 Y:2015 06 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $178 $0 Implemented
UK1509 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $273 $0 Implemented
UK1509 # 03 Y:2015 03 2015 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $218 $0 Implemented
UK1314 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $690 Implemented
UK1314 # 09 Y:2013 09 2013 USE PHOTOCELL CONTROLS $328 $592 Implemented
UK1314 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $700 Implemented
UK1314 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,662 $650 Implemented
UK1314 # 06 Y:2013 06 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,594 $0 Implemented
UK1314 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,066 $0 Implemented
UK1314 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,453 $15,000 Implemented
UK1314 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,739 $4,500 Implemented
UK1314 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,512 $28,560 Implemented
UK1314 # 01 Y:2013 01 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,434 $44,000 Implemented