Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0340 # 02 Y:2023 | 02 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,688 | $320 | Implemented |
MZ0340 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,529 | $720 | Implemented |
MZ0340 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,531 | $5,336 | Implemented |
MZ0340 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $618 | $260 | Implemented |
MZ0315 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $250 | Implemented |
MZ0315 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,818 | $360 | Implemented |
MZ0315 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,771 | $14,420 | Implemented |
MZ0315 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,404 | $480 | Implemented |
MZ0315 # 06 Y:2022 | 06 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $16,735 | $15,782 | Implemented |
MZ0321 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,778 | $5,120 | Implemented |
MZ0321 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,197 | $657 | Implemented |
MZ0321 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,760 | $11,000 | Implemented |
MZ0321 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $46,936 | $63,900 | Implemented |
MZ0300 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,784 | $200 | Implemented |
MZ0300 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,598 | $1,650 | Implemented |
MZ0276 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $249 | $1,040 | Implemented |
MZ0276 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,641 | $180 | Implemented |
MZ0276 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $367 | $120 | Implemented |
MZ0276 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $191 | $390 | Implemented |
MZ0276 # 04 Y:2019 | 04 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $44,070 | $184,040 | Implemented |
MZ0276 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $60 | Implemented |
MZ0272 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,929 | $250 | Implemented |
MZ0272 # 02 Y:2019 | 02 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $241 | $105 | Implemented |
MZ0272 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,084 | $1,860 | Implemented |
MZ0272 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,655 | $180 | Implemented |