Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0227 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,564 $7,061 Implemented
UU0227 # 12 Y:2023 12 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $53 $333 Implemented
UU0227 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,237 $6,000 Implemented
UU0227 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,776 $3,465 Implemented
UU0227 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $4,289 $9,282 Implemented
UU0227 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,358 $13,337 Implemented
UU0227 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,103 $7,349 Implemented
UU0227 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,325 $78,840 Implemented
UU0227 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,169 $10,776 Implemented
UU0227 # 10 Y:2023 10 2023 MINIMIZE WATER USAGE $2,457 $2,652 Implemented
UU0220 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $1,200 Implemented
UU0220 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,160 $50 Implemented
UU0220 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,986 $13,500 Implemented
UU0220 # 01 Y:2023 01 2023 USE HEAT PUMP FOR SPACE CONDITIONING $67,069 $0 Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $107 Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0138 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $599 $150 Implemented
UU0138 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $615 $0 Implemented
UU0138 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,089 $1,500 Implemented
UU0138 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UU0138 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,044 $2,760 Implemented
UU0138 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,221 $18,137 Implemented
BS0076 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $655 $768 Implemented