IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0858 # 01 Y:2008 01 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,046 $0 Implemented
GT0858 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,189 $33,180 Implemented
GT0858 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,063 $10,879 Implemented
GT0858 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,485 $4,500 Implemented
AM0554 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $51,670 $2,000 Implemented
AM0554 # 08 Y:2008 08 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,185 $500 Implemented
AM0554 # 09 Y:2008 09 2008 SELL OIL TO RECYCLER $1,240 $0 Implemented
AM0554 # 05 Y:2008 05 2008 PAY UTILITY BILLS ON TIME $9,462 $0 Implemented
AM0554 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $5,400 Implemented
AM0554 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $213,800 $45,770 Implemented
AM0554 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $133,000 $1,000 Implemented
LL0305 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $490 Implemented
LL0305 # 02 Y:2008 02 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,261 $1,320 Implemented
LL0305 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,925 $348 Implemented
LL0305 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,846 $3,025 Implemented
LE0281 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,477 $1,790 Implemented
LE0281 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,441 $2,500 Implemented
LE0281 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $923 $240 Implemented
LE0278 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $1,824 Implemented
LE0278 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $36,970 $760 Implemented
LE0278 # 06 Y:2008 06 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,828 $7,000 Implemented
LE0278 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,373 $142,010 Implemented
LE0278 # 13 Y:2008 13 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,785 $450 Implemented
IA0431 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,028 $1,014 Implemented
IA0431 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $723 $346 Implemented