IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0430 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,421 $0 Implemented
SF0430 # 02 Y:2013 02 2013 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,697 $768 Implemented
SF0430 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,822 $885 Implemented
SF0430 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,465 $16,491 Implemented
SF0430 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,727 $9,958 Not Implemented
SF0430 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $841 $2,072 Not Implemented
SF0430 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $4,481 Not Implemented
SF0430 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,029 $5,603 Not Implemented
MA0708 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,752 $30,000 Not Implemented
MA0708 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $3,194 $7,450 Not Implemented
MA0708 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,140 $400 Implemented
MA0708 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,828 $3,200 Implemented
MA0707 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,613 $1,000 Implemented
MA0707 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $972 $200 Implemented
MA0707 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $807 $1,840 Not Implemented
MA0707 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $439 $3,057 Not Implemented
MA0707 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $412 $200 Implemented
UA0099 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109,678 $164,833 Not Implemented
UA0099 # 02 Y:2013 02 2013 DISCONNECT BALLASTS $3,632 $242 Not Implemented
UA0099 # 03 Y:2013 03 2013 USE RADIANT HEATER FOR SPOT HEATING $25,020 $52,360 Not Implemented
UA0099 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $19,434 $14,980 Not Implemented
UA0099 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,301 $5,000 Implemented
UA0099 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,883 $400 Not Implemented
DL0103 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $59,100 $250,000 Not Implemented
DL0103 # 02 Y:2013 02 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $25,000 $45,000 Implemented