IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0270 # 14 Y:2015 14 2015 INSTALL OCCUPANCY SENSORS $1,131 $1,220 Not Implemented
MI0270 # 15 Y:2015 15 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $970 $80 Implemented
MI0270 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $49,371 $1,400 Not Implemented
MI0270 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $29,534 $20,088 Implemented
MI0270 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,500 $80 Implemented
MI0270 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $12,676 $3,600 Implemented
BD0455 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $140,934 $105,000 Not Implemented
BD0455 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,322 $13,700 Implemented
BD0455 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,997 $40,950 Implemented
BD0455 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $11,689 $17,188 Not Implemented
BD0455 # 05 Y:2015 05 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,295 $25 Implemented
BD0455 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,580 $2,250 Implemented
BD0455 # 07 Y:2015 07 2015 USE SYNTHETIC LUBRICANT $4,742 $300 Not Implemented
BD0455 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,994 $900 Implemented
BD0455 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,388 $25 Implemented
BD0455 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $845 $2,500 Not Implemented
BD0455 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $839 $725 Implemented
BD0455 # 12 Y:2015 12 2015 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $157,388 $8,500 Not Implemented
CO0699 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,690 $290 Implemented
CO0699 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,720 $13,660 Not Implemented
CO0699 # 03 Y:2015 03 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,040 $13,500 Not Implemented
CO0699 # 04 Y:2015 04 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,890 $500 Implemented
SF0458 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,859 $840 Implemented
SF0458 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,195 $0 Not Implemented
SF0458 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,339 $0 Implemented