IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0199 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $8,626 $1,786 Not Implemented
MI0199 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,954 $2,200 Implemented
MI0199 # 04 Y:2010 04 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,308 $7,450 Implemented
MI0199 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,329 $1,210 Implemented
MI0199 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $37,073 $6,280 Implemented
MI0199 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,552 $4,531 Implemented
MI0178 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,417 $70,875 Not Implemented
MI0178 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $53,553 $7,140 Implemented
MI0178 # 03 Y:2009 03 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $18,854 $40,320 Not Implemented
MI0178 # 04 Y:2009 04 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $17,481 $11,118 Not Implemented
MI0178 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,720 $1,210 Implemented
MI0178 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,908 $4,531 Implemented
MI0178 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,282 $40 Implemented
UF0411 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,719 $4,557 Not Implemented
UF0411 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,620 $6,301 Not Implemented
UF0411 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,287 $40,292 Implemented
UF0411 # 04 Y:2008 04 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,258 $461 Implemented
UF0411 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $1,200 $215 Implemented
UF0411 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $888 $364 Not Implemented
UF0411 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $62,348 $20,000 Not Implemented
UF0411 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,520 $1,000 Not Implemented
UF0411 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,144 $426 Implemented
UF0411 # 10 Y:2008 10 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,946 $25,280 Not Implemented
UF0411 # 11 Y:2008 11 2008 MODIFY WORKLOAD $8,002 $0 Not Implemented
UF0411 # 12 Y:2008 12 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,419 $3,400 Not Implemented