IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0518 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $149 $210 Implemented
IA0518 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,190 $8,793 Implemented
IA0518 # 08 Y:2014 08 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $462 $80 Implemented
IA0518 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,803 $2,302 Implemented
AM0659 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,940 $11,920 Not Implemented
AM0659 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,935 $3,000 Implemented
AM0659 # 03 Y:2014 03 2014 OPTIMIZE PLANT POWER FACTOR $4,840 $18,470 Implemented
AM0659 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,040 $250 Implemented
AM0659 # 05 Y:2014 05 2014 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $560 $600 Not Implemented
AM0659 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $360 $0 Not Implemented
AM0659 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $115 $0 Not Implemented
UA0122 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $26,427 $700 Not Implemented
UA0122 # 02 Y:2014 02 2014 MODIFY STARTUP/SHUTDOWN TIMES $13,749 $0 Not Implemented
UA0122 # 03 Y:2014 03 2014 COMBINE UTILITY METERS $87 $0 Not Implemented
UA0122 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,325 $12,089 Not Implemented
UA0122 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $7,195 Implemented
UA0122 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,196 $100 Implemented
UA0122 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,622 $654 Not Implemented
BS0033 # 01 Y:2014 01 2014 INSTALL STEAM TRAP $123 $217 Not Implemented
BS0033 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,073 $15 Not Implemented
BS0033 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $263 $168 Not Implemented
BS0033 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $464 $10 Not Implemented
BS0033 # 05 Y:2014 05 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,302 $17,525 Not Implemented
BS0033 # 06 Y:2014 06 2014 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,800 $2,668 Not Implemented
BS0033 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $2,179 $360 Not Implemented