IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0452 # 11 Y:2012 11 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,487 $10,561 Not Implemented
WV0452 # 12 Y:2012 12 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,146 $618 Implemented
WV0452 # 13 Y:2012 13 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,098 $1,105 Implemented
WV0452 # 14 Y:2012 14 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $873 $4,350 Not Implemented
WV0452 # 15 Y:2012 15 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $1,505 Not Implemented
WV0452 # 16 Y:2012 16 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $277 $85 Implemented
NC0457 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $7,711 Implemented
NC0457 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $415 $525 Implemented
NC0457 # 03 Y:2012 03 2012 LOWER CEILING TO REDUCE CONDITIONED SPACE $19,472 $40,000 Not Implemented
NC0457 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $400 Implemented
NC0457 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,516 $0 Implemented
NC0457 # 06 Y:2012 06 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,161 $2,000 Not Implemented
NC0458 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $453 $100 Implemented
NC0458 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,650 $1,040 Not Implemented
NC0458 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,851 $26,563 Implemented
NC0458 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,659 $441 Implemented
NC0458 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $169 $250 Implemented
NC0458 # 06 Y:2012 06 2012 IMPROVE SPACE COMFORT CONDITIONING $83,263 $35,225 Not Implemented
NC0458 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $196,000 $25,000 Not Implemented
NC0458 # 08 Y:2012 08 2012 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $211,680 $48,800 Implemented
SF0418 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $40,533 $0 Implemented
SF0418 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,408 $0 Implemented
SF0418 # 03 Y:2012 03 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,193 $9,787 Not Implemented
SF0418 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,230 $15,467 Implemented
SF0418 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,301 $8,388 Implemented