IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

609

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0409 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,013 $7,800 Not Implemented
WV0409 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $2,838 Implemented
WV0409 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $3,087 $625 Implemented
WV0409 # 05 Y:2010 05 2010 RECOVER MECHANICAL ENERGY $2,064 $1,000 Not Implemented
WV0409 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,693 $985 Not Implemented
WV0409 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $600 Implemented
WV0409 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,480 $0 Implemented
WV0409 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,292 $3,520 Implemented
WV0409 # 10 Y:2010 10 2010 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,165 $400 Not Implemented
WV0409 # 11 Y:2010 11 2010 USE OPTIMUM THICKNESS INSULATION $1,139 $625 Not Implemented
WV0409 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $544 $690 Not Implemented
UD0793 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $25,000 Implemented
UD0793 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,677 $1,000 Implemented
UD0793 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,960 $500 Not Implemented
UD0793 # 04 Y:2009 04 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,855 $0 Implemented
UD0793 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,799 $400 Not Implemented
UD0793 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,114 $0 Implemented
UD0793 # 07 Y:2009 07 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $1,000 Implemented
UD0793 # 08 Y:2009 08 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,460 $2,500 Implemented
UD0793 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $0 Implemented
UD0793 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,256 $4,820 Not Implemented
UD0793 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $1,000 Implemented
UD0793 # 12 Y:2009 12 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $435 $0 Not Implemented
UD0775 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $2,738 Implemented
UD0775 # 02 Y:2008 02 2008 INSTALL AUTOMATIC STACK DAMPER $650 $400 Implemented