IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0080 # 03 Y:2023 03 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,846 $4,160 Implemented
NL0080 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,163 $4,000 Implemented
NL0080 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $761 $560 Not Implemented
NL0080 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $754 $660 Implemented
NL0080 # 07 Y:2023 07 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $423 $844 Implemented
NL0080 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186 $420 Implemented
NL0080 # 09 Y:2023 09 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $171 $80 Implemented
UD1061 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,507 $1,764 Not Implemented
UD1061 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,024 $375 Implemented
UD1061 # 03 Y:2023 03 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,796 $340 Not Implemented
UD1061 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,383 $8,996 Not Implemented
UD1061 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $952 Implemented
UD1061 # 06 Y:2023 06 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,842 $100,000 Not Implemented
MU0028 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $0 Implemented
MU0028 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,322 $0 Not Implemented
MU0028 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,919 $0 Implemented
MU0028 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $138 $348 Implemented
MU0028 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $863 $112 Implemented
MU0028 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $1,100 Implemented
MU0028 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $550 $776 Not Implemented
MU0028 # 08 Y:2023 08 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $490 $1,162 Not Implemented
MS0415 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,189 $1,523 n/a
MS0415 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $115,378 $781,550 n/a
MS0415 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,575 $72,865 n/a
MS0415 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $11,642 $2,942 n/a