IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0107 # 04 Y:2006 04 2006 REPLACE BOILER $1,090 $800 Not Implemented
UU0107 # 05 Y:2006 05 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,470 $8,820 Not Implemented
UU0107 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $1,690 $1,860 Not Implemented
UD0752 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,473 $40,463 Implemented
UD0752 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,542 $0 Implemented
UD0752 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,798 $225 Implemented
UD0752 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,557 $0 Implemented
UD0752 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,592 $0 Implemented
UU0104 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,040 $10,000 Not Implemented
UU0104 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $2,420 $2,000 Not Implemented
UU0104 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,540 $3,530 Not Implemented
UU0104 # 04 Y:2006 04 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $104,490 $16,800 Not Implemented
UU0104 # 05 Y:2006 05 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $198,120 $1,974,210 Not Implemented
UU0104 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,650 $28,400 Not Implemented
UU0104 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $3,510 $8,490 Not Implemented
WI0523 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $58,800 $3,000 Not Implemented
WI0523 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,911 $52,320 Not Implemented
WI0523 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,347 $1,000 Implemented
WI0523 # 04 Y:2006 04 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0523 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,735 $800 Not Implemented
WI0523 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
UF0390 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148,376 $619,757 Not Implemented
UF0390 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,981 $8,763 Not Implemented
UF0390 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $87,992 $39,000 Not Implemented
UF0390 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $41,661 $1,080 Not Implemented