IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0390 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,722 $0 Not Implemented
UF0390 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,951 $31,040 Not Implemented
UF0390 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,826 $513 Not Implemented
UF0390 # 08 Y:2006 08 2006 USE PHOTOCELL CONTROLS $909 $306 Not Implemented
UF0390 # 09 Y:2006 09 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,903 $20,000 Not Implemented
UF0390 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $437 $347 Not Implemented
UF0390 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,152 $36,122 Not Implemented
UF0390 # 12 Y:2006 12 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,655 $1,610 Not Implemented
UF0390 # 13 Y:2006 13 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $979 $4,996 Not Implemented
UF0390 # 14 Y:2006 14 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $118,800 $8,400 Not Implemented
SU0241 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,985 $0 Not Implemented
SU0241 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19 $0 Implemented
SU0241 # 03 Y:2006 03 2006 CONVERT TO ELECTROSTATIC POWDER COATING $15,419 $4,500 Not Implemented
SU0241 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $765 $201 Implemented
SU0241 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,054 $2,928 Implemented
SU0241 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $290 $239 Not Implemented
SU0241 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $602 $712 Not Implemented
SU0241 # 08 Y:2006 08 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,784 $19,571 Not Implemented
SU0241 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $24,622 Implemented
UF0387 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $1,545 $2,803 Implemented
UF0387 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,561 $2,190 Implemented
UF0387 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $7,957 $0 Not Implemented
UF0387 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,639 $3,360 Not Implemented
UF0387 # 05 Y:2006 05 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,265 $578 Not Implemented
UF0387 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,577 $370 Implemented