IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

609

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0685 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,625 $0 Implemented
UD0685 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,440 $4,000 Not Implemented
UD0685 # 03 Y:2004 03 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $9,450 $0 Implemented
UD0685 # 04 Y:2004 04 2004 ADD AREA LIGHTING SWITCHES $5,855 $1,900 Not Implemented
UD0685 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,880 $0 Implemented
UD0685 # 06 Y:2004 06 2004 AIR CONDITION ONLY SPACE NECESSARY $4,540 $0 Implemented
UD0685 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,020 $0 Implemented
UD0685 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,970 $420 Implemented
UD0685 # 09 Y:2004 09 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,480 $2,730 Implemented
UD0676 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $19,216 $6,000 Implemented
UD0676 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,997 $5,000 Not Implemented
UD0676 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,900 $0 Not Implemented
UD0676 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,015 $25,000 Implemented
UD0676 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $8,147 $2,000 Implemented
UD0676 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $2,363 $225 Not Implemented
UD0676 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,739 $500 Not Implemented
UD0676 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $200 Implemented
UD0675 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $26,842 $625 Implemented
UD0675 # 02 Y:2003 02 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $10,610 $1,200 Implemented
UD0675 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $7,934 $2,500 Not Implemented
UD0675 # 04 Y:2003 04 2003 COMBINE UTILITY METERS $4,000 $0 Not Implemented
UD0675 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,130 $0 Implemented
UD0675 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,068 $384 Implemented
UD0675 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,355 $280 Implemented
UD0675 # 08 Y:2003 08 2003 REDUCE FLUID FLOW RATES $2,011 $1,200 Not Implemented