Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,447
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0341 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $874 | $1,990 | Implemented |
IA0341 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $123 | $289 | Implemented |
BD0260 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,265 | $0 | Implemented |
BD0260 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,158 | $900 | Implemented |
BD0260 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $5,118 | $6,900 | Implemented |
BD0260 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,159 | $1,159 | Implemented |
BD0260 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,427 | $3,000 | Implemented |
BD0260 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,226 | $1,000 | Implemented |
BD0260 # 07 Y:2004 | 07 | 2004 | INSTALL TURBULATORS | $1,553 | $3,500 | Implemented |
BD0260 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,267 | $656 | Implemented |
BD0260 # 09 Y:2004 | 09 | 2004 | INSTALL AUTOMATIC STACK DAMPER | $991 | $1,500 | Implemented |
BD0260 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $547 | $551 | Implemented |
BD0260 # 11 Y:2004 | 11 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $312 | $670 | Implemented |
BD0260 # 12 Y:2004 | 12 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $377 | $1,000 | Implemented |
BD0260 # 13 Y:2004 | 13 | 2004 | USE POWER DURING OFF-PEAK PERIODS | $1,766 | $0 | Implemented |
WI0470 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,014 | $26,070 | Not Implemented |
WI0470 # 02 Y:2004 | 02 | 2004 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $4,976 | $28,750 | Not Implemented |
WI0470 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,832 | $0 | Not Implemented |
WI0470 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,353 | $5,780 | Implemented |
WI0470 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,484 | $896 | Implemented |
WI0470 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,293 | $0 | Implemented |
WI0470 # 07 Y:2004 | 07 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,075 | $4,000 | Not Implemented |
WI0470 # 08 Y:2004 | 08 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $579 | $0 | Not Implemented |
TA0074 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,000 | $14,432 | Not Implemented |
TA0074 # 02 Y:2004 | 02 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,340 | $72 | Not Implemented |