Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,345
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0676 # 06 Y:2003 | 06 | 2003 | DISCONNECT BALLASTS | $2,363 | $225 | Not Implemented |
UD0676 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,739 | $500 | Not Implemented |
UD0676 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $200 | Implemented |
NC0263 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $118,487 | $500 | Not Implemented |
NC0263 # 02 Y:2003 | 02 | 2003 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $22,423 | $10,000 | Not Implemented |
NC0263 # 03 Y:2003 | 03 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $33,114 | $24,600 | Not Implemented |
NC0263 # 04 Y:2003 | 04 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $47,210 | $100,000 | Implemented |
NC0263 # 05 Y:2003 | 05 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,768 | $10,000 | Not Implemented |
NC0263 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $46,271 | $135,400 | Not Implemented |
NC0263 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $556 | $680 | Implemented |
NC0263 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $240 | Implemented |
UD0675 # 01 Y:2003 | 01 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $26,842 | $625 | Implemented |
UD0675 # 02 Y:2003 | 02 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $10,610 | $1,200 | Implemented |
UD0675 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $7,934 | $2,500 | Not Implemented |
UD0675 # 04 Y:2003 | 04 | 2003 | COMBINE UTILITY METERS | $4,000 | $0 | Not Implemented |
UD0675 # 05 Y:2003 | 05 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,130 | $0 | Implemented |
UD0675 # 06 Y:2003 | 06 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,068 | $384 | Implemented |
UD0675 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,355 | $280 | Implemented |
UD0675 # 08 Y:2003 | 08 | 2003 | REDUCE FLUID FLOW RATES | $2,011 | $1,200 | Not Implemented |
UD0675 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,480 | $9,600 | Not Implemented |
UD0675 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $695 | $0 | Implemented |
UD0675 # 11 Y:2003 | 11 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $525 | $1,750 | Not Implemented |
UD0675 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $430 | $100 | Implemented |
UD0675 # 13 Y:2003 | 13 | 2003 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $250 | $424 | Not Implemented |
UD0675 # 14 Y:2003 | 14 | 2003 | ADD AREA LIGHTING SWITCHES | $240 | $200 | Not Implemented |