Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0487 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,650 | $35 | Implemented |
IA0487 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,490 | $6,000 | Implemented |
IA0487 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $398 | $250 | Not Implemented |
IA0487 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $856 | $331 | Implemented |
IA0487 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $3,110 | $6,400 | Not Implemented |
IA0487 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,511 | $19,201 | Implemented |
IA0487 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,612 | $72,410 | Implemented |
BD0409 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $11,228 | $2,550 | Implemented |
BD0409 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,259 | $41,728 | Implemented |
BD0409 # 11 Y:2012 | 11 | 2012 | USE EVAPORATION TO CONCENTRATE MATERIAL | $153 | $600 | Not Implemented |
BD0409 # 10 Y:2012 | 10 | 2012 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,032 | $1,600 | Not Implemented |
BD0409 # 09 Y:2012 | 09 | 2012 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,782 | $1,500 | Not Implemented |
BD0409 # 08 Y:2012 | 08 | 2012 | USE PHOTOCELL CONTROLS | $307 | $200 | Implemented |
BD0409 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $535 | $450 | Implemented |
BD0409 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $793 | $500 | Not Implemented |
BD0409 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,253 | $10 | Not Implemented |
BD0409 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,040 | $3,510 | Implemented |
BD0409 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,270 | $2,500 | Not Implemented |
IA0472 # 06 Y:2011 | 06 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,318 | $12,000 | Not Implemented |
IA0472 # 01 Y:2011 | 01 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,238 | $9,000 | Not Implemented |
IA0472 # 02 Y:2011 | 02 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,811 | $15,000 | Not Implemented |
IA0472 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,302 | $420 | Implemented |
IA0472 # 04 Y:2011 | 04 | 2011 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,084 | $358 | Implemented |
IA0472 # 05 Y:2011 | 05 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,002 | $3,600 | Not Implemented |
IA0472 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,172 | $10,141 | Implemented |