IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0697 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,000 $500 Not Implemented
CO0697 # 04 Y:2014 04 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $8,560 $38,890 Not Implemented
CO0697 # 03 Y:2014 03 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $13,090 $87,610 Not Implemented
CO0697 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,760 $1,550 Not Implemented
CO0697 # 01 Y:2014 01 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,320 $29,550 Not Implemented
OK0900 # 04 Y:2014 04 2014 USE RADIANT HEATER FOR SPOT HEATING $12,584 $11,196 Not Implemented
OK0900 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $194 $178 Not Implemented
OK0900 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $761 $2,775 Implemented
OK0900 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,054 $2,932 Implemented
TT0143 # 04 Y:2014 04 2014 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,178 $100 Implemented
TT0143 # 03 Y:2014 03 2014 DISCONNECT BALLASTS $214 $70 Not Implemented
TT0143 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $3,000 Not Implemented
TT0143 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,223 $75 Implemented
WM0055 # 07 Y:2014 07 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,975 $0 Not Implemented
WM0055 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,131 $7,030 Not Implemented
WM0055 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $610 $630 Not Implemented
WM0055 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,969 $715 Not Implemented
WM0055 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,316 $600 Not Implemented
WM0055 # 02 Y:2014 02 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,514 $0 Not Implemented
WM0055 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,250 $7,500 Not Implemented
WM0055 # 08 Y:2014 08 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $955 $3,000 Not Implemented
WM0055 # 09 Y:2014 09 2014 MINIMIZE WATER USAGE $24,836 $160 Not Implemented
BS0042 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,955 $450 Implemented
BS0042 # 06 Y:2014 06 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,668 $9,641 Not Implemented
BS0042 # 03 Y:2014 03 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,279 $17,525 Not Implemented