Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,345
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0751 # 01 Y:2022 | 01 | 2022 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,526 | $140 | Not Implemented |
OR0751 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,956 | $1,175 | Not Implemented |
OR0751 # 03 Y:2022 | 03 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $74,774 | $48,589 | Not Implemented |
OR0751 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,125 | $1,272 | Not Implemented |
CW0122 # 01 Y:2022 | 01 | 2022 | TREAT AND REUSE RINSE WATERS | $11,974 | $2,500 | n/a |
CW0122 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,767 | $400 | n/a |
CW0122 # 03 Y:2022 | 03 | 2022 | CONVERT TO ROBOTIC PAINTING | $102,960 | $48,500 | n/a |
CW0122 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,171 | $73,990 | n/a |
CW0122 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $13,037 | $60,000 | n/a |
CW0122 # 06 Y:2022 | 06 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $42,376 | $188,648 | n/a |
IC0258 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $875 | $50 | Not Implemented |
IC0258 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $766 | $1,297 | Not Implemented |
IC0258 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $217 | $247 | Not Implemented |
IC0258 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,997 | $3,655 | Not Implemented |
IP0155 # 01 Y:2022 | 01 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,832 | $0 | Implemented |
IP0155 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,118 | $0 | Implemented |
IP0155 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,553 | $131 | Implemented |
IP0155 # 04 Y:2022 | 04 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $13,401 | $740 | Implemented |
IP0155 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $1,518 | Implemented |
IP0155 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,289 | $1,882 | Implemented |
IP0155 # 07 Y:2022 | 07 | 2022 | USE PHOTOCELL CONTROLS | $152 | $456 | Implemented |
IP0155 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $2,516 | Implemented |
AM0843 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $18,385 | $33,511 | Not Implemented |
AM0843 # 02 Y:2022 | 02 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,030 | $110 | Not Implemented |
AM0843 # 03 Y:2022 | 03 | 2022 | COMBINE UTILITY METERS | $7,115 | $4,500 | Not Implemented |