IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,251

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0373 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,444 $25,685 Implemented
MI0373 # 03 Y:2020 03 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,501 $16,518 Not Implemented
MI0373 # 04 Y:2020 04 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,395 $1,470 Implemented
MI0373 # 05 Y:2020 05 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,315 $27,047 Not Implemented
MI0373 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,980 Implemented
MI0373 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $176 $480 Implemented
AM0804 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $124,900 $15,000 Not Implemented
AM0804 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $11,260 $16,200 Not Implemented
AM0804 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $11,800 $0 Not Implemented
AM0804 # 04 Y:2020 04 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $630 $100 Implemented
AM0804 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $505 $13 Implemented
MA0818 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,422 $970 Not Implemented
MA0818 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,320 $9,808 Implemented
MA0818 # 03 Y:2020 03 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,714 $5,600 Not Implemented
MA0818 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $837 $4,000 Not Implemented
MA0818 # 05 Y:2020 05 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $789 $1,700 Implemented
MA0818 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $782 $2,450 Not Implemented
MA0818 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $500 Implemented
WV0593 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,054 $69,828 Implemented
WV0593 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $9,611 $20,330 Implemented
WV0593 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,095 $4,464 Not Implemented
WV0593 # 04 Y:2020 04 2020 RECYCLE WHITE WATER $8,377 $11,018 Not Implemented
WV0593 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,139 $1,114 Implemented
WV0593 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,451 $44 Implemented
WV0593 # 07 Y:2020 07 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,437 $4,000 Not Implemented