IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2015 # 03 Y:2020 03 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $53 $0 Not Implemented
CL2015 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,229 $4,600 Not Implemented
CW0115 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $1,350 Not Implemented
CW0115 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $1,893 $10,137 Not Implemented
CW0115 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $233 $22 Implemented
CW0115 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $333 $90 Implemented
CW0115 # 05 Y:2020 05 2020 RECOVER AND REUSE COOLING WATER $3,922 $10,595 Not Implemented
CW0115 # 06 Y:2020 06 2020 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $28 $188 Implemented
CW0115 # 07 Y:2020 07 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $221 $250 Not Implemented
CW0115 # 08 Y:2020 08 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,017 $10,620 Implemented
IC0245 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $575 $517 Implemented
IC0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,465 $4,250 Implemented
IC0245 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $801 Implemented
IC0245 # 04 Y:2020 04 2020 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,231 $0 Implemented
IC0245 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $23,890 $13,698 Implemented
TT0245 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,084 $1,500 Implemented
TT0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,143 $150 Implemented
TT0245 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $1,789 $4,500 Not Implemented
TT0245 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,356 $900 Not Implemented
AM0811 # 01 Y:2020 01 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,123 $20,000 Implemented
AM0811 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,800 $6,000 Implemented
AM0811 # 03 Y:2020 03 2020 PAY UTILITY BILLS ON TIME $7,866 $0 Implemented
AM0811 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,900 $60 Not Implemented
AM0811 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,530 $255 Implemented
AM0811 # 06 Y:2020 06 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $460 $200 Implemented