Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0845 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,785 | $906,122 | Not Implemented |
MA0845 # 05 Y:2022 | 05 | 2022 | ADJUST VENTS TO MINIMIZE ENERGY USE | $8,349 | $10,667 | Not Implemented |
MA0845 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,754 | $14,292 | Implemented |
MA0845 # 02 Y:2022 | 02 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,668 | $60,000 | Implemented |
MA0845 # 03 Y:2022 | 03 | 2022 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,709 | $182,139 | Not Implemented |
MA0845 # 07 Y:2022 | 07 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,762 | $505 | Not Implemented |
MA0845 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $6,066 | $2,910 | Not Implemented |
MA0818 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $782 | $2,450 | Not Implemented |
MA0818 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,320 | $9,808 | Implemented |
MA0818 # 03 Y:2020 | 03 | 2020 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,714 | $5,600 | Not Implemented |
MA0818 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,422 | $970 | Not Implemented |
MA0818 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $837 | $4,000 | Not Implemented |
MA0818 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $500 | Implemented |
MA0818 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $789 | $1,700 | Implemented |
MA0782 # 05 Y:2017 | 05 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $160 | $100 | Not Implemented |
MA0782 # 02 Y:2017 | 02 | 2017 | INSULATE BARE EQUIPMENT | $7,638 | $1,583 | Implemented |
MA0782 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $277 | $100 | Implemented |
MA0782 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,221 | $78,750 | Not Implemented |
MA0782 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,366 | $600 | Implemented |
MA0775 # 04 Y:2017 | 04 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,486 | $21,000 | Not Implemented |
MA0775 # 02 Y:2017 | 02 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $20,697 | $100 | Implemented |
MA0775 # 06 Y:2017 | 06 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $708 | $412 | Not Implemented |
MA0775 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $28,320 | $16,929 | Not Implemented |
MA0775 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,966 | $20,488 | Not Implemented |
MA0775 # 03 Y:2017 | 03 | 2017 | AIR CONDITION ONLY SPACE NECESSARY | $13,365 | $7,900 | Not Implemented |