Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0090 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $822 | $1,190 | Not Implemented |
NL0090 # 04 Y:2023 | 04 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,454 | $1,764 | Not Implemented |
NL0090 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,382 | $4,500 | Implemented |
NL0090 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,629 | $7,670 | Implemented |
NL0090 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,602 | $19,848 | Implemented |
NL0090 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $831 | Not Implemented |
NL0089 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,309 | $1,800 | n/a |
NL0089 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $722 | $125 | n/a |
NL0089 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,535 | $5,000 | n/a |
NL0089 # 01 Y:2023 | 01 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $4,883 | $6,825 | n/a |
NL0089 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,790 | $15,516 | n/a |
NL0080 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $754 | $660 | Implemented |
NL0080 # 09 Y:2023 | 09 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $171 | $80 | Implemented |
NL0080 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $420 | Implemented |
NL0080 # 07 Y:2023 | 07 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $423 | $844 | Implemented |
NL0080 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,794 | $120 | Implemented |
NL0080 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $761 | $560 | Not Implemented |
NL0080 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,690 | $38,085 | Not Implemented |
NL0080 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $4,000 | Implemented |
NL0080 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,846 | $4,160 | Implemented |
NL0015 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,693 | $189,100 | Implemented |
NL0015 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,416 | $0 | Implemented |
NL0015 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,079 | $12,500 | Not Implemented |
NL0015 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,800 | $0 | Implemented |
NL0015 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,190 | $4,500 | Implemented |