IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0128 # 12 Y:2018 12 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $200 Not Implemented
WM0128 # 11 Y:2018 11 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $637 $740 Implemented
WM0128 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $765 $600 Not Implemented
WM0128 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,172 Implemented
WM0128 # 08 Y:2018 08 2018 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,291 $533 Not Implemented
WM0128 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $1,744 $5,250 Implemented
WM0128 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,084 $0 Implemented
WM0128 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,391 $22,752 Implemented
WM0128 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $20,855 $48,500 Not Implemented
WM0128 # 03 Y:2018 03 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,244 $6,840 Not Implemented
WM0128 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,118 $19,300 Implemented
WM0128 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,496 $2,000 Implemented
BS0114 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $337 Implemented
BS0114 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,222 $21,742 Not Implemented
BS0114 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $7 Not Implemented
BS0114 # 07 Y:2018 07 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $8,591 $166,500 Not Implemented
BS0114 # 02 Y:2018 02 2018 CONVERT TO ELECTROSTATIC POWDER COATING $26,520 $21,600 Implemented
BS0114 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,503 $11,880 Not Implemented
BS0114 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $423 $250 Implemented
UU0138 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $599 $150 Implemented
UU0138 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,044 $2,760 Implemented
UU0138 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,221 $18,137 Implemented
UU0138 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,089 $1,500 Implemented
UU0138 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UU0138 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $615 $0 Implemented