IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,188

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0071 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $349 $660 Implemented
BS0071 # 04 Y:2016 04 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $765 $2,575 Implemented
BS0071 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $372 $384 Not Implemented
IA0555 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,345 $65,008 Implemented
IA0555 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,046 $9,800 Not Implemented
IA0555 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $190 Implemented
IA0555 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $574 $1,680 Implemented
IA0555 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $518 $500 Implemented
IA0555 # 06 Y:2016 06 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $304 $500 Not Implemented
IA0555 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $30 Not Implemented
UK1601 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $5,045 $7,350 Not Implemented
UK1601 # 02 Y:2016 02 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $19,178 $60,000 Not Implemented
UK1601 # 03 Y:2016 03 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,523 $0 Not Implemented
UK1601 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,569 $3,000 Not Implemented
UK1601 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,706 $750 Not Implemented
UK1601 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,798 $34,110 Not Implemented
UK1601 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $849 $175 Not Implemented
UK1601 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $707 Not Implemented
UK1601 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $1,200 Not Implemented
UK1601 # 10 Y:2016 10 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $315 $0 Not Implemented
UK1601 # 11 Y:2016 11 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $309 $710 Not Implemented
UK1601 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,351 $0 Not Implemented
UK1601 # 13 Y:2016 13 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $192 $0 Not Implemented
BD0470 # 01 Y:2015 01 2015 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $26,090 $30,000 Not Implemented
BD0470 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,593 $7,220 Not Implemented